Footings being preped Foundation prep work Cement being poured for foundation Water tank for sprinkler system Steel for building being delivered The beginning stages of the steel being installed Photo taken on November 17 Steel frame completed! Siding being installed A portion of the driveway gets a binder coat. Another side almost complete Cement flooring being poured Propane tanks installed Power to the building ableit by very long extension cord! Windows and siding installed Insulation being installed Work continues despite the frigid temperatures Bay doors installed Interior walls being installed Building is now weather tight Selectmen toured the site on Jan. 27th Thank you North Shore Bank, Newton, NH for the donation of the flag pole and flag.